Eastern Quarry, Ebbsfleet

White Peak Planning were instructed to conduct an initial appraisal of options for a wastewater treatment works (WwTW).

An off-site solution was deemed too costly and posed a significant risk to the environment and build programme. To address this an alternative on-site option was chosen.

To find out more, view the Case Study below.

Ebbsfleethttps://i1.wp.com/whitepeakplanning.co.uk/wp-content/uploads/2020/10/20170930_135829.jpg?resize=300%2C169&ssl=1 300w, https://i1.wp.com/whitepeakplanning.co.uk/wp-content/uploads/2020/10/20170930_135829.jpg?resize=1024%2C576&ssl=1 1024w, https://i1.wp.com/whitepeakplanning.co.uk/wp-content/uploads/2020/10/20170930_135829.jpg?resize=768%2C432&ssl=1 768w, https://i1.wp.com/whitepeakplanning.co.uk/wp-content/uploads/2020/10/20170930_135829.jpg?resize=1536%2C864&ssl=1 1536w, https://i1.wp.com/whitepeakplanning.co.uk/wp-content/uploads/2020/10/20170930_135829.jpg?resize=1200%2C675&ssl=1 1200w" data-lazy-sizes="(max-width: 1170px) 100vw, 1170px" data-lazy-src="https://i1.wp.com/whitepeakplanning.co.uk/wp-content/uploads/2020/10/20170930_135829.jpg?fit=2048%2C1152&ssl=1&is-pending-load=1" srcset="data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7" />